Red Hot Blue Glue
Red Hot Blue Glue® is a very aggressive, blue, medium bodied, fast setting PVC solvent cement. It is chemically the “hottest” solvent cement formulation available on the market today.
It is designed to be used on all schedules and classes of PVC pipe through 6", schedule 80 through 4". Red Hot is ideal for both quick pressurization and demanding conditions. Red Hot is our best solvent for all PVC applications through 6", including wet or cold condition applications.
- Bonds flexible PVC pipe to coupling in BIOFALLS Filter & Skimmers.
- Designed for flexible & ridgid PVC pipe.
- Red Hot does not require the use of a purple primer, unless specified by local code because it dries with a blue color.
- Excellent for wet or damp conditions
- Very fast setting
- Can be used "as is" through 6" diameter piping, unless local code requires a primer
- Blue in color to show you quantity applied
- Has excellent "gap-filling" capability
- The preferred solvent cement of many professionals
- Suitable for potable water, DWV, sewer, conduit, sprinkler, pool, spa and PVC flex-vinyl applications.
NSF-IAPMO listed.
Conforms to South Coast Air Quality Management District (SCAQMD) Rule 1168/316A.
To view a printable .pdf copy of the MSDS (Material Safety Data Sheet) that has been filed with the EPA, click on the link at the end of this statement. To return to this screen, click on your browser's BACK arrow (located in the upper left corner of your screen). "DOWNLOAD MSDS"
COLD WEATHER SOLVENT CEMENTING
Joining PVC Plastic Pipe In Cold Weather
Working in freezing termperatures is difficult, if unavoidable. Red Hot Blue Glue® is the finest available for extreme conditions. Red Hot Blue Glue® has EXCELLENT COLD WEATHER STABILITY for virtually all practical applications.
GOOD JOINTS CAN BE MADE WITH RED HOT BLUE GLUE® AT BELOW FREEZING
By following our standard instructions and using a little extra care and patience, successful solvent cemented joints can be made at tempertatures even as low as 10° F. In cold weather, solvents penetrate and soften the plastic surfaces more slowly than in warm weather. Also, the plastic is more resistant to solvent attack.
Therefore, it becomes even more important to presoften surfaces with Purple Primer. Longer cure times are also necessary. The cure schedules printed in our technical brochure allow a wide margin for safety, but for colder weather, more time should be allowed.
KEYS TO COLD WEATHER SOLVENT CEMENTING
- Prefabricate as much of the system as is possible in a heated and ventilated work area.
- Store cements and primers in a warm area when not in use and make sure they remain fluid. Store fittings in a warmer area if possible as well.
- Take special care to remove dirt, moisture including ice and snow from the surfaces to be joined.
- Use primer to soften the joining surfaces before applying cement. More than one application may be necessary. Aggressively “Scrub” primer into pipe surface until milky.
- Be sure to apply solvent cement “ male-female-male” sequentially-per directions on can.
- Wipe-off excess cement and solvent bead.
- Allow a longer cure period before the system is used.
- Read and follow all of our directions carefully before installation.
THE WORSE THE CONDITIONS, THE MORE IMPORTANT
IT IS TO HAVE QUALITY INSTALLATION!!